DECK INFO

DECKING INFORMATION: GENERAL NOTES CAPS AND POSTS ANCHORING AND FASTENERS  H1 CONNECTORS  CONNECTOR INFORMATION  DECK DESIGN GUIDE  IRC – 2012 NAHB GUIDELINES ...

WOOD DECKING INFO

WOOD DECKING INFORMATION  – CLICK HERE   INSTALLATION OF STONE OVER WOOD FRAMED DECKS – CLICK HERE   PRODUCTS DESIGNED FOR INSTALLATION OF PAVERS OVER WOOD DECKS – CLICK HERE...

UNGROUNDED CIRCUITS

Ungrounded Electrical Receptacles by Nick Gromicko Grounding of electrical receptacles (which some laypeople refer to as outlets) is an important safety feature that has been required in new construction since 1962, as it minimizes the risk of electric shock and...

SAMPLE REPORTS

INSPECTION REPORT SAMPLES ALL POINTS INSPECTION REPORT FOUNDATION SURVEY DRAWING/REPORT WDI (TERMITE) REPORT AND TREATMENT PLAN PLUMBING CAMERA ASSESSMENT REPORT MOLD INSPECTION REPORT LIMITED SCOPE INSPECTION...

HAZARDOUS MATERIALS

HAZARDOUS MATERIALS BASIC INFORMATION The following links will provide basic information in regards to common hazardous materials found in older commercial and residential structures. ASBESTOS HUD Information on Asbestos – CLICK HERE EPA Information on Asbestos...

PMP

PREVENTATIVE MAINTENANCE PLAN – COMMERCIAL For a commercial maintenance plan checklist, please follow the link HERE.

HVAC MAINTENANCE

BOILER INFORMATION AND RECOMMENDATIONS Before the cold season arrives where ever you may reside, preparing your boiler with regular preventative maintenance for the heating season is critical to efficient and safe operation. The frequency of common boiler issues, such...